•
Home
/
A track record built with Nigeria’s leading operators — from marine equipment supply to EPC pipeline works, since 2010.
Flowline / Pipeline Leak Repair in Swamp Areas (Brass)
NAOC
2022
ongoing
Flowline / Pipeline Leak Repair in Swamp Areas (Bayelsa)
2020
Hire & Operation of 2× 1000MT Fuel Barges (MLJ Favour 1 & MT Deborah)
2021
Hire & Operation of 1,000T Spud Barge (MLJ Favour 02 & 04)
2021–2023
Completed
EPC of Deep 5 Hookup ARM Modification (Bayelsa)
Procurement of Equipment & Flowmeters
SPDC
Hiring & Operation of MLJ Favour 07 and Favour 08
Belemaoil Producing Ltd
2020-2021
Laying of 4″ x 5Km Dual String of Ebegoro Well 4
2017
completed
Supply of AGO to NAOC PH Jetty
10 UTM of Oshie Flow Station
2016
Replacement of Damaged Valves for Oshie
Construction of Edema Well 3LS & 3S Flowline
Bistan Global Services
Transmission Pipeline & Metering Stations (EPC)
2014
Integrity Assessment & Upgrade/Expansion of Metering Station
Ultrasonic Thickness Measurement, NAOC Oshie Flow Station
5km Road Construction at Datekwale Community (Delta State)
2013-2014
Pilling: Bridge Precast Pilling at Abua Gdp Construction
2015
Conductor Pilling at Agip Plant Location, Sambri
2013
Conductor Pilling Shell Location at Oshie
Fabrication of Pipeline / Maintenance
Daewoo, Port Harcourt
Supply of Oil Tools — Christmas Tree, Well Heads
Supply of 1,300 Tons Fuel Barge Mu Favour 01
Masters Energy, Port Harcourt
Supply of 1,300 Tons Fuel Barge Mu Favour
Conoil Plc, Nigeria
Dredging of Nigerian Agip Oil Company Port Harcourt Jetty Front
2011
Supply of Marine Equipment, Port Harcourt
2010
Supply of 800 Tons Ramp Barge J-kol L
2010-2013
Servicing of Valves / Replacement
2011–Present
Ongoing
Supply of Automotive Gas Oil, Brass Terminal
2010–Present
Supply of Automotive Gas Oil, NAOC PH Jetty
Clean-Up of Oil Spillage of Several Locations
2010–2015
Supply of Generators 27kva to NAOC, Port Harcourt